  • The Delivery Plan applies to which ERCOT component?
  • What is the maximum duration for hydro generation per deployment, absent an Emergency Event Area declaration?
  • Which condition leads to an exemption from PSS/AVR testing requirements?
  • Which statement best describes ERCOT's approach to maintaining a voltage profile?
  • For under-frequency relays that count cycles, what is the maximum delay?
  • What does EEA stand for in ERCOT terminology?
  • How many DC (AC-DC-AC) ties connect ERCOT to other interconnections?
  • What is the maximum droop setting for All Generating Units/Generating Facilities/CLRs other than a Combustion Turbine (Combined Cycle)?
  • The high side winding configuration mentioned in the GMD operating procedure requirement is what?
  • Which entities must be notified for a planned change affecting reactive capability of the generator?
  • For under-frequency relays that do not count cycles, maximum delay?
  • Who submits the outage schedule to ERCOT?
  • What term describes a RAS that operates for the system conditions it was designed to operate for but fails to mitigate the power system conditions it was designed to address?
  • Is the following statement true or false: ERCOT provides notification of proposed RASs/PCAPs on MIS secure area?
  • Which term best describes a unit that must operate to maintain system reliability?
  • What is the maximum provisional qualification period for a load resource to provide Ancillary Services?
  • Which activity is an operational duty of ERCOT?
  • Which ancillary service type in ERCOT is used for recovery after outages?
  • When was the first ERCOT system connection established, and which entities were involved?
  • Sequence of events recording equipment includes any device capable of recording circuit breaker position (open/close). True or False?
  • Which set of UF relay actuation frequencies and corresponding load drops matches the documented table?
  • After Non-Spin resources are deployed, what action is taken regarding remaining RRS capacity?
  • What does ERCOT employ to maintain system security and reliability?
  • Which components constitute Ancillary Services?
  • Which statement about voltage ride through (VRT) requirements is true?
  • TOAPS notifications are posted in MIS secure area.
  • Level 1 maintenance outage is equipment removed from service within how many hours to prevent a forced outage, and requires ERCOT notification and justification?
  • Which term correctly describes ERCOT-issued directives to TOs/QSEs to perform specific actions?
  • Under what conditions do Resource Entities (REs) communicate directly with ERCOT?
  • How are islands connected following blackstart?
  • Which of the following is NOT a listed type of transmission outage?
  • Which condition indicates that time error correction has secured?
  • Level 2 maintenance outage is equipment removed from service within how many days to prevent a forced outage?
  • Which statement about Dispatch Instructions is incorrect?
  • True or False: Current Transformers or their secondary windings shall be located so that adjacent protection zones overlap.
  • How long in advance must the outage schedule be submitted to ERCOT?
  • The trip coil of circuit breakers in protective schemes is associated with which function?
  • What does HASL stand for in this context?
  • During non-peak load seasons, scarcity conditions are triggered when load reaches or exceeds how many MW?
  • What are the automatic actions to maintain security of the system called?
  • Which threshold triggers EEA Level 3 for the frequency criteria?
  • All generation facilities providing voltage support service (VSS) shall comply with all VSS dispatch instructions or ______ voltage set point instruction unless compliance is impossible due to a _________________.
  • Which option describes the seven-day forecast for reliability planning?
  • The 200 kV threshold in the GMD operating procedure relates to which component characteristic?
  • True or False: A communications failure in and of itself is a misoperation.
  • What percentage of total Texas load is served by ERCOT?
  • Which term describes a protective relay that trips unnecessarily during a fault?
  • Unnecessary protective relay operation for a fault not within the zone of protection
  • BLT not allowed under which condition?
  • During time error correction initiation, what frequency offset is used for fast responding resources?
  • ERCOT informs which group of entities of GMD alerts and warnings?
  • ERCOT manages the deregulated market for 100% of Texas.
  • What are the manual actions to maintain security of system called?
  • If PRC and spinning reserves drop below 3,000 MW, the manual deployment of RRS is described as which release?
  • Who issues routers, switches, and out-of-band management equipment for WAN?
  • What is the time ramp requirement for RRS resources?
  • What rating is used pre-contingency by ERCOT?
  • Level 3 maintenance outage is equipment removed from service within how many days to prevent a forced outage?
  • Which statement accurately describes the relationship between ECRS and Non-Spin?
  • Which acronym represents manual actions to maintain system security?
  • On-line generation resources must be able to commence their shutdown sequences within ________ minutes of receipt of verbal dispatch.
  • Which statement is true about Voltage Support Service (VSS) within ERCOT ancillary services?
  • Clock synchronization requirement for fault recorders relative to Coordinated Universal Time (UTC) with or without a local time offset for Central Prevailing Time (CPT) is within what tolerance?
  • Through whom must a Generation Resource licensed by a federal regulatory agency provide grid interconnection and performance licensing requirements to ERCOT and the TSP?
  • Which data types are exchanged over the ERCOT WAN?
  • In EEA Level 3, automatic load shedding occurs when PRC is less than what MW value?
  • During the Adjustment Period, which action is performed by ERCOT?
  • How often must a QSE schedule reactive verification testing?
  • What does QSE stand for in ERCOT market participants?
  • RASs are included in which processes?
  • During an EEA Level 2 event, which ERS deployment option is used?
  • Which ERCOT communication category is issued during emergencies requiring attention?
  • Mitigation Plans are used to manage what?
  • What ERS is deployed during EEA Level 1?
  • Remedial Action Schemes (RAS) or AMPs are intended to allow resources to operate at what rating?
  • Block Load Transfer (BLT) schemes are implemented under which conditions?
  • Under which conditions can Block Load Transfer (BLT) schemes be implemented?
  • What percentage range describes the share of ERCOT's energy market made up by bilateral transactions?
  • Load-following units are used to follow the load curve and may go offline at night.
  • Which of the following is NOT one of the eight components of the ERCOT Nodal Market?
  • What is the primary purpose of ERCOT?
  • What frequency is the Load Frequency Control (LFC) system set to?
  • What is ERCOT's minimum obligation for Responsive Reserve Service (RRS) in megawatts?
  • What are the manual actions used to manage localized voltage issues called?
  • How much of the time does ERCOT operate without deploying RRS?
  • Which Emergency Notice is issued when PRC falls below 2,300 MW and is not projected to be recovered above 2,300 MW within 30 minutes?
  • Telemetry testing for a Load Resource is conducted how often and validated how often?
  • What is the minimum generator size for requiring a PSS?
  • Which Emergency Notice will be issued when the clock-minute average system frequency falls below 59.91 Hz for 20 consecutive minutes?
  • During black start recovery, which facility is considered critical?
  • Which statement best describes Base Load Units?
  • What is the maximum governor dead band for controllable load resource (CLR)?
  • What size blocks are used to shed load?
  • In the ANCF formula, what unit is used for Annual Total Net Generation?
  • Which term is used to describe the RUC process after the DRUC?
  • At what voltage does a Resource or Customer-owned switching device that can interrupt flow through network transmission equipment require an agreement with the Transmission Operator (TO) to schedule Outages on and perform emergency switching of the device?
  • Which components are included in fixed costs?
  • A forced outage is initiated by protective relay or manually in response to observation by field personnel or transmission operator that equipment poses a threat to personnel or equipment. What action is required?
  • Time error correction will terminate after the period of correction reaches how many hours?
  • What is the emergency voltage range for 138 kV lines?
  • ANCF is expressed as a percentage of what?
  • Generator UF relays trip and time delay exists for which frequency ranges and delays?
  • Which statement best describes the RRS ramp and responsiveness requirement?
  • After all available Non-Spin has been deployed, ERCOT releases all remaining RRS capacity from Generation Resources and Controllable Load Resources when PRC is at or below what MW?
  • The rate segments for Emergency Ramp Rate are expressed in which unit per minute?
  • Manual deployment of RRS would be recalled under which condition?
  • Which of the following is NOT a component of ERCOT's ECRS?
  • In a load shed situation, how much load is automatically shed by UF relays?
  • As part of restoring voltage after a contingency, which action is ERCOT authorized to take?
  • What is the maximum droop setting for a Combustion Turbine (Combined Cycle)?
  • Which formula correctly calculates total production cost?
  • Who requires notification if the owner determines that the protective relay system has failed?
  • True or False: A Remedial Action Scheme (RAS) and/or AMPs may also be implemented in order to allow Generation Resources or Transmission Facilities that would otherwise be subject to restrictions to operate to their full Rating.
  • ERCOT designates mandatory fault recording at which locations?
  • For controllable load resources, what is a requirement for UF relays?
  • What are the automatic actions used to manage localized voltage issues called?
  • What does RRS stand for in the ERCOT context?
  • The purpose of providing RRS is to supply what?
  • What does LSE stand for in ERCOT market participants?
  • True or False: The Generation Resource must notify the facility licensee through its QSE of any requirements that cannot be satisfied.
  • What are different types of CMP?
  • Which statement describes peaking capacity units?
  • What action is ordered when PRC falls below 1,000 MW and is not projected to be recovered above 1,000 MW within 30 minutes, or when the clock-minute average frequency falls below 59.91 Hz for 25 consecutive minutes?
  • How long do transmission operators have to notify ERCOT if there's a change in status of a transmission facility?
  • How is load forecast calculated?
  • What is the purpose of the Delivery Plan described as?
  • What does RE stand for in ERCOT market participants?
  • Post-contingency with an approved RAP uses what ratings within 15 minutes?
  • What systems provide operational and market information to QSEs/TOs?
  • True or False: Generators owned by a federal regulatory agency do not need to communicate through the QSE.
  • Which nominal voltages are defined for Normal and Emergency Voltage Limits?
  • What is the most important part of writing switching orders?
  • If an UF relay connected load is dropped, what action will the DSP take?
  • Interrupted Load restoration requires ERCOT operator approval.
  • How many miles of 345 kV transmission lines does ERCOT own?
  • What is the emergency voltage range for a 69 kV line?
  • What are the costs associated with power production?
  • What is the minimum recording rate for fault recording equipment?
  • What action does a Resource Entity take when there is a planned change affecting the reactive capability of the generator?
  • In response to a change in AVR status, what action is required from the Resource Entity?
  • Which factor is the main determinant of load forecast?
  • How often is the TO's UF relay compliance tested and who receives the results?
  • Which statement best describes the role of the QSE in ERCOT communications?
  • What are the types of resource outages?
  • What are the operating time limits for hydro generation when deployed for RRS?
  • What is the Adjustment Period in ERCOT operations?
  • What EEA level is triggered when the clock-minute average system frequency falls below 59.91 Hz for 25 consecutive minutes, or below 59.5 Hz for any duration?
  • How much time does ERCOT allow for a QSE that fails to provide seasonal test data on unit capability?
  • In the Delivery Plan context, which component is included as part of a RMR unit?
  • During EEA Level 3, firm load shedding occurs when PRC falls below what MW?
  • If it requires breaker or switch manipulations of a non-MW producing generator, it should be complete ASAP not to exceed ______ minutes.
  • What does TDSP stand for in ERCOT market participants?
  • Outages at or above which voltage must be submitted to ERCOT?
  • RASs are automatically armed.
  • Must-run units are defined as units that are necessary for voltage support and stability and may be under an agreement with ERCOT; they may not be economical.
  • Which term describes a protective relay that trips when there is no fault?
  • For which type of transformer are internal bushing types preferred over external slip-over types?
  • What can be deployed by LFC to maintain frequency?
  • Which market is included in managing the Ancillary Services Market?
  • Under voltage ride through (VRT) requirements, Vt deviations greater than 5% but less than 10% of the rated design voltage are allowed for less than how many seconds?
  • What term describes an event beyond the reasonable control of an entity that prevents performance?
  • Which of the following is an ERCOT ancillary service type?
  • Which item is not considered part of the protective relay system architecture?
  • In normal operations, who directs Voltage Set Points for Generation Resources interconnected to a Transmission Service Provider's facilities, and how is this accomplished?
  • Who coordinates the operation of Reactive Power devices controlled by a TO or a QSE?
  • Which statement describes how ERCOT's ECRS is dispatched?
  • VRT does not apply to generator faults between terminals and the transmission side of step-up transformers when what occurs?
  • The range between High Sustained Limit and Low Sustained Limit defines what?
  • Which of the following are considered critical loads for load restoration?
  • Which MIS area is used to post an OCN?
  • What does CR stand for in ERCOT market participants?
  • What are the UF relay requirements for load resources used as RRS?
  • Which Emergency Notice is issued at the most severe level described in the material?
  • What voltage level triggers ERCOT notification for all protective system misoperations?
  • What is the normal voltage range for a 69 kV line?
  • RASs are included in SCED, Outage coordination, and Reliability Unit Commitment (RUC).
  • What is the normally specified full reserve requirement amount?
  • When is a Watch issued by ERCOT?
  • What is the maximum governor dead band for a Hydro Turbine with a Mechanical Governor?
  • The Average Seasonal Net Max Sustainable Rating is derived from data submitted via which system?
  • What is the normal voltage range for 138 kV lines?
  • Which acronym represents automatic actions to maintain system security?
  • What is the total mileage of ERCOT's transmission lines?
  • Which of the following is among ERCOT Responsibilities?
  • For a planned change affecting reactive capability, which two entities must be notified at least 60 days in advance?
  • What is the purpose of developing a Constraint Management Plan (CMP) in voltage management?
  • True or False: All Remedial Action Scheme (RAS) misoperations shall be documented and ERCOT shall be notified.
  • Which resources are classified as Static Reactive Power resources used to adjust voltage under TO control?
  • Incremental costs always rise as output increases.
  • QSEs are tested every 3 years to respond within how many minutes to an order to use CFC?
  • When would ERCOT instruct QSEs to deploy available contracted ERS-10 Resources, undeployed ERS-30, and/or deploy ERCOT Contingency Reserve Service (ECRS) or RRS supplied from Load Resources?
  • Which of the following is a core ERCOT Process?
  • What tool disseminates information to market participants?
  • What term describes the cost of economical system balance?
  • ERCOT's RRS can be deployed through which of the following methods?
  • During the Adjustment Period, which group can request resource de-commitments?
  • What makes up the Day-Ahead Operations?
  • What are the physical facility communications equipment requirements for WAN participants?
  • Which of the following best describes a variable production cost?
  • Which action is a QSE explicitly required to perform upon a change in resource status?
  • Under what condition can ERCOT remove contingencies from the RUC process?
  • The ramp rate range is defined by which two limits?
  • Which Emergency Notice is issued when PRC falls below 2,300 MW and is not projected to recover above 2,300 MW within 30 minutes?
  • What is the maximum governor dead band for a Steam Turbine with a Mechanical Governor?
  • Which statement about outages eligibility applies to 60 KV or above devices?
  • How many entities make up the Eastern Interconnection?
  • Who isolates blackstart resources from the BES during a blackstart condition?
  • Which term describes a protective relay that fails to trip when a fault occurs?
  • Which term describes a protective relay that trips more slowly than intended during a fault?
  • Oncor is responsible for what percentage of total ERCOT load shed?
  • During a forced outage, which notification is required?
  • Within what time frame must ERCOT allow access to its facilities after notice?
  • How is a reactive capability limit curve sent to ERCOT?
  • What are the miles associated with 69 kV transmission lines?
  • Recall condition for manual RRS deployment includes which expression?
  • What is the purpose of the Day-Ahead Reliability Unit Commitment (DRUC)?
  • Who directs setting voltage set points? How do they do it?
  • What is the maximum rate of change (up and down) in MW per minute of a Resource to provide Responsive Reserve (RRS) deployed by ERCOT, described by up to ten segments across its capacity?
  • CenterPoint is responsible for what percentage of total ERCOT load shed?
  • During termination of an Energy Emergency Alert (EEA), which action typically follows restoring full reserve requirements?
  • Which term does CMPs stand for in ERCOT operations?
  • During EEA termination, which parties are notified of the termination?
  • Which of the following is an ERCOT Nodal Market component?
  • Do Municipally Owned Utilities have to opt into retail competition?
  • When PRC drops below 2500 MW, what will ERCOT issue?
  • Which of the following is NOT a ERCOT Core Process?
  • If ERCOT loses its AGC control and all backup facilities are unavailable, what control mode are QSEs ordered to use for the duration of the loss?
  • How long must the clock-minute average frequency stay below 59.91 Hz to trigger load shedding in the specified condition?
  • When a QSE providing regulation loses Automatic Generation Control (AGC), what action does ERCOT take?
  • How many miles of transmission line does ERCOT own at the 138 kV level?
  • When does ERCOT have to implement time error correction?
  • Post-contingency transmission voltage must not deviate from the nominal per-unit voltage by more than what percent?
  • Which hardware specification is required for WAN participant racks?
  • Which fuels are typically associated with Base Load Units?
  • What action is taken if an outage cannot meet credible N-1 criteria?
  • Who is responsible for load shed?
  • Which entity is NOT a recipient of a Transmission Operator's notification upon receipt of an OCN?
  • What size generators require VSS?
  • What is the minimum initiation frequency for under-frequency relays?
  • Which Emergency Notice may be issued when the clock-minute average system frequency falls below 59.91 Hz for 15 consecutive minutes?
  • What is the maximum governor dead band for All Generating Units/Generating Facilities (Other than those with mechanical governors)?
  • What equipment ratings are used when developing RAPs?
  • Which statement correctly describes the relationship between OCNs and CMPs?
  • How often are AVR systems tested, and what is the timeline after a modification?
  • Who will maintain their control system time within ±3 seconds of the National Bureau of Standards (NBS) time signal?
  • In calculating ANCF, which hours are not included in the Annual Hours total?
  • Which statement best defines Transmission Congestion?
  • What does ERCOT issue in an emergency condition that could cause uncontrollable separation or large-scale disruption?
  • Which formula correctly defines ANCF?
  • What components comprise production costs?
  • What are the types of transmission outages?
  • Which entity is NOT a recipient of a Qualified Scheduling Entity's notification upon receipt of an OCN?
  • How does ERCOT issue operation information to TDSP/QSE?
  • After submission of coordinated reactive capability testing, by what time does ERCOT/TO have to approve or deny the request?
  • Where in the MIS does ERCOT post all CMPs and RASs?
  • How many segments describe the available rate of change for a Resource's capacity in the RRS description?
  • Can Hydro-Generators be used for RRS, and if so, how?
  • A RAS operates for the system conditions it was designed to operate for but the RAS operation results in an unintended adverse power system response
  • True or False: ICCP links are secure and do not require redundancy.
  • What does NOIE stand for in ERCOT market participants?
  • Which Emergency Notice will be issued when PRC cannot be maintained above 1,375 MW or when the clock-minute average system frequency falls below 59.91 Hz for 25 consecutive minutes?
  • Which devices can a Transmission Operator operate to adjust voltage?
  • Which of the following is NOT a category of ERCOT communications?
  • If a Load Resource fails to provide annual and biennial verification data for two consecutive years, what action does ERCOT take after a 30-day deficiency correction period?
  • Generator OF relays trip and time delays occur for which frequency ranges and delays?
  • Who is responsible for reporting and correcting accumulated time error?
  • Who interfaces with the Wide Area Network (WAN) Participants?
  • What is the difference between Non-Spin and CLRs as it relates to deployment?
  • Which conditions trigger EEA Level 2?
  • Non-coordinated reactive capability testing must be submitted at least how many hours before the test?
  • Which action is ERCOT authorized to take by temporarily changing limits on resources or transmission facilities?
  • For coordinated reactive capability testing, what time is preferred for submitting the test through the QSE to ERCOT/TO the day before the test?
  • Who is required to have a vegetation management program?
  • Who is the point of contact for initiation of generation interconnection?
  • True or False: Resource Entities may violate their Corrected Unit Reactive Limit (CURL) or URL if ordered by ERCOT.
  • Where does ERCOT get GMD data from?
  • Which item is part of the ERCOT Core Processes?
  • Which ERS is deployed during EEA Level 2?
  • Which is not a type of CMP?
  • Is the following statement true or false: ERCOT provides notification of proposed TOAPS on MIS secure area?
  • A Power System Stabilizer is used to dampen frequency oscillations within which range?
  • True or False: Resource Entities are staffed and monitored 24x7, regardless of resource schedule.
  • Who creates the short supply and emergency condition procedures?
  • Which statement accurately describes QSE availability for scheduling?
  • Post-contingency without an approved RAP uses what rating in the initial period, and how long to reach normal rating?
  • What must be committed for day-ahead and real-time load?
  • During time error correction initiation, what frequency offset is used for slow responding resources?
  • True or False: ERCOT does not require the physical security system requirements of NERC.
  • How does ERCOT initiate/secure time error correction?
  • Which of the following is a valid reason for not complying with VSS dispatch or voltage set point instructions?
  • What is issued when PRC falls below 3000 MW and an EEA level 2 or 3 is expected?
  • After a modification, when must the PSS be tested?
  • Unnecessary protective relay operation when no fault or abnormal condition has occurred
  • Which duty includes performing load flows and security analyses of outages submitted by QSEs, TSPs, or DCTOs as a basis for approval or rejection?
  • During Peak Load season, scarcity conditions are triggered when total load reaches or exceeds how many MW?
  • What are the two categories of outages?
  • If a resource providing Ancillary Services fails to meet ERCOT requirements for two consecutive months, what action does ERCOT take?
  • Which CIP standards address physical security requirements for WAN participants?
  • What is it called when ERCOT does the RUC process after the DRUC?
  • Where is the inadvertent energy between ERCOT and non-ERCOT areas (via DC Ties) tracked and accounted for?
  • If a resource providing AS fails to meet ERCOT requirements for four consecutive months?
  • Who must be notified if system frequency falls below 59.91 Hz for 30 minutes?
  • Which statement about OCNs is correct?
  • What term describes ERCOT-issued instructions to TOs/QSEs that must be followed?
  • What is the purpose of firm load shedding?
  • Voltage and current sensing devices providing inputs to protective relays perform what role?
  • A TO is required to implement a GMD operating procedure when it operates transmission equipment that includes a power transformer with a high side winding that is wye-grounded and terminal voltage greater than what threshold?
  • Which task involves examining outages to ensure N-1 credibility?
  • What is the threshold frequency used to trigger a frequency-based action in ERCOT procedures?
  • Which data type uses XML formatting on the ERCOT WAN?
  • At what voltage do protective relays become required in systems?
  • What is the plan containing the hours and levels of operation that a RMR unit, including a synchronous condenser unit, is instructed to operate called?
  • Which set of subcommittees accurately makes up the ERCOT technical advisory committee?